Master Bedroom
No sign of the Mud Men on the Monday after Christmas, but they turned up mob-handed the following day and finished their first pass of the entire house before I even arrived.

Kitchen
There's a lot of mess everywhere now so I won't be able to spend my first night at the house any time soon, but with the first coat of tape and mud complete we should be able to get the house painters in to prime the walls just two weeks from today.

Basement
Turns out that, in their haste, the drywall gang covered up at least one light switch, in the master bedroom, so there's a little extra work for them to do on a return trip some day soon, and they still have a couple of other bits and pieces to finish before all is said and done.

Utility Room
Rich the Contractor brought over a couple of electric heaters yesterday to help speed up the drying process, and once the mud is dry - presumably by tomorrow, and if not, by Friday - the Mud Men can come back, do some sanding, and then apply the second coat (of three).

No comments: